ROAD WORK IN THE FARM

May  10/ 2009

Piedra Blanca, Dominican Republic

Second Stage

Stones and Cement


The next step will be:

to make a channel for the water to run away on the sides of the road,  then 

stones are going at the sides of the road to hold in the paving stones and the channel for the water.

 

Pictures from May 16th Next Stage >>>

 

Floor Plan of the first stage building is now in progress >>

 

Here are the picture we took on Saturday May 9  in the Farm

It was raining a lot so it was very muddy but here are the pictures ...

Stone layer on the road:

 

<< back to road Work part 1

Floor Plan of the first stage building -  now in progress >>

 